well , it has been real slow, we were all ready to pour cement when the snow started. but happy days the sun is out and the cement will be poured on monday and on wed framing will start.
this will be a 1600 sq ft three bedroom, two bath home. with a greaat room dining room, and open kitchen.
and every thing will be wheelchair accessible and a two car attached garage,
the basement will be set up so that we can put in a 2 bedroom apt.
we can hardly wait. we will have pictures next week, so long until then
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment